A clearer path through business compliance.Built for businesses across India

Industries

Chemicals plastics and hazardous industries

Organise substance, process, premises and waste records around the actual activities carried out at each site.

Illustration of entrepreneurs planning together in a sunlit workspace.

Classify the activity and material

Distinguish chemical synthesis, blending, repacking, storage, trading, plastic conversion and waste recovery. Record substance identity, concentration, maximum storage quantity and process conditions. A product name or broad industry description is not enough to determine the applicable permissions.

Keep raw materials, saleable products, by-products and wastes separately identified. Commercial value alone should not be used to assume a residue is outside the waste framework.

Build a site-specific permission map

Assess pollution consents, environmental clearance, hazardous-chemical duties and waste authorisations separately against the project and process. Use the actual instruments, schedules and current state-board procedures. The hazardous-chemical framework and hazardous-waste framework address different questions; one permission does not establish compliance with both.

Before increasing capacity, adding a substance or changing storage arrangements, check whether permissions and emergency arrangements need revision. Assign technical assessment to competent environmental and safety specialists.

Maintain evidence that operations can use

  • Process flow, material balance, storage layout and substance inventory.
  • Current safety data sheets, labels, worker training and emergency contacts.
  • Consent conditions, monitoring reports, inspections and corrective-action records.
  • Waste classifications, quantities, storage records and documented transfers to authorised recipients.
  • Supplier specifications, customer restrictions and import or export documentation.

Connect plastics and packaging roles

A plastic-product manufacturer, packaging producer, importer and brand owner may have different responsibilities. Assess the actual packaging category and commercial role under the applicable plastic-waste and EPR framework. Keep packaging quantities and counterparty records connected to purchases, production and sales rather than estimating them only when a return is due.

Use finance records to support traceability

Reconcile input purchases, production yields, recoveries, finished stock and waste-disposal costs. Document job-work ownership and movements. Restrict access to proprietary formulations while making the required safety information available to the people who need it.

For example, introducing a solvent-based coating line can change emissions, chemical storage and waste streams even when the company sells the same finished product. The operational change should trigger a permission and control review before commissioning.

Scope of support

Kosha can help coordinate records, accounting, tax and compliance schedules. Process design, hazardous-material classification, emergency planning and statutory technical certification require the appropriate specialists; this page does not provide handling instructions.

Start with the site and the proposed change

Prepare a brief that compares the existing operation with the proposed one: processes, capacity, materials, storage areas and expected output streams. Attach an index of current permissions and their conditions, with unresolved observations clearly identified. A dated comparison helps the specialist see what has changed even when the business continues to sell the same product.

  • Use pollution consent assessment for the scope of the existing consent and questions raised by a process or capacity change.
  • Use hazardous-waste support for the relevant waste record and authorisation worklist. Identify each stream and its existing assessment; keep uncertain classifications open for the technical specialist.
  • Use plastic packaging EPR support for the separately assessed packaging role and quantity records. Include packaging bought, supplied and returned, with the counterparties and reporting period identified.

Keep a submission register alongside the brief: document version, owner, date supplied, question raised and response received. A submitted application, an unanswered query and an issued permission should remain distinguishable in the project record.

References and official procedures

Source material consulted 1 October 2026. Check the applicable instrument, period and portal instructions for the actual assignment.

Related starting points